LNG Chain

Gas transmission pipeline · Bovanenkovskoye Oil and Gas Field to Ukhta

Bovanenkovo-Ukhta Gas Pipeline

Bovanenkovo-Ukhta Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 1,200 km long and 57.5 bcm/y of capacity, starting up in 2017. It runs from Bovanenkovskoye Oil and Gas Field to Ukhta. It is owned by Gazprom PJSC.

Length

1,200 km

Capacity

57.5 bcm/y

42.3 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1420 mm (56 in)

Route

Bovanenkovo-Ukhta Gas Pipeline runs from Bovanenkovskoye Oil and Gas Field to Ukhta. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bovanenkovskoye Oil and Gas Field
To
Ukhta
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
1,178 km
GEM pipeline ID
P0738
Start year
2017
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Pipeline 2OperatingBovanenkovskoye Oil and Gas Field → Ukhta1,20057.51420 mm2017GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Pechora LNG TerminalRussiaExportCancelled14.8 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies