Gas transmission pipeline · West Texas to Agua Dulce
Blackcomb Pipeline
Blackcomb Pipeline is an under construction gas transmission pipeline in United States. The tracker lists 1 tracked segment, 589 km long and 25.55 bcm/y of capacity, starting up in 2026. It runs from West Texas to Agua Dulce. It is owned by WPC Joint Venture and Targa Resources Corp.
Length
589 km
Capacity
25.6 bcm/y
18.8 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 1067 mm (42 in)
Route
Blackcomb Pipeline runs from West Texas to Agua Dulce. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- West Texas
- To
- Agua Dulce
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 706 km
- GEM pipeline ID
- P7828
- Start year
- 2026
- GEM wiki page
- Not reported
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Main Line | Under construction | West Texas → Agua Dulce | 589 | 25.6 | 1067 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.