Gas transmission pipeline · Berri to New South Wales
Berri to Mildura Pipeline
Berri to Mildura Pipeline is an operating gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 148 km long and 0.02 bcm/y of capacity, starting up in 1999. It runs from Berri to New South Wales. It is owned by Australian Gas Infrastructure Group.
Length
148 km
Capacity
0.02 bcm/y
0.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 114 mm (4.5 in)
Route
Berri to Mildura Pipeline runs from Berri to New South Wales. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Berri
- To
- New South Wales
- Start country
- Australia
- End country
- Australia
- Countries crossed
- Australia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Oceania
- Route drawn on map
- 159 km
- GEM pipeline ID
- P3645
- Start year
- 1999
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Berri → New South Wales | 148 | 0.02 | 114 mm | 1999 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Berri to Mildura Pipeline run?
- Berri to Mildura Pipeline runs from Berri to New South Wales, crossing Australia.
- How long is Berri to Mildura Pipeline?
- Berri to Mildura Pipeline is 148 km long.
- How much gas can Berri to Mildura Pipeline carry?
- Berri to Mildura Pipeline has a design capacity of 0.02 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Berri to Mildura Pipeline operating?
- Berri to Mildura Pipeline is operating, having started in 1999.
- Who owns Berri to Mildura Pipeline?
- Berri to Mildura Pipeline is owned by Australian Gas Infrastructure Group, as recorded in the current tracker release.