Belousovo-Leningrad Gas Pipeline is an operating gas transmission pipeline in Russia. The tracker lists 1 tracked segment, 765 km long and 7 bcm/y of capacity, starting up in 1964. It runs from Zhukovsky District to Saint-Petersburg. It is owned by Gazprom PJSC.

Length

765 km

Capacity

7 bcm/y

5.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1020 mm (40 in)

Route

Belousovo-Leningrad Gas Pipeline runs from Zhukovsky District to Saint-Petersburg. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Zhukovsky District
To
Saint-Petersburg
Start country
Russia
End country
Russia
Countries crossed
Russia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
695 km
GEM pipeline ID
P2285
Start year
1964
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineOperatingZhukovsky District → Saint-Petersburg76571020 mm1964GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Gorskaya FLNG TerminalRussiaExportCancelled23.9 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Belousovo-Leningrad Gas Pipeline run?
Belousovo-Leningrad Gas Pipeline runs from Zhukovsky District to Saint-Petersburg, crossing Russia.
How long is Belousovo-Leningrad Gas Pipeline?
Belousovo-Leningrad Gas Pipeline is 765 km long.
How much gas can Belousovo-Leningrad Gas Pipeline carry?
Belousovo-Leningrad Gas Pipeline has a design capacity of 7 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Belousovo-Leningrad Gas Pipeline operating?
Belousovo-Leningrad Gas Pipeline is operating, having started in 1964.
Who owns Belousovo-Leningrad Gas Pipeline?
Belousovo-Leningrad Gas Pipeline is owned by Gazprom PJSC, as recorded in the current tracker release.
Does Belousovo-Leningrad Gas Pipeline serve an LNG terminal?
Belousovo-Leningrad Gas Pipeline passes within 25 km of 1 tracked LNG terminal. Proximity is not proof of a physical connection; each match is listed with its distance and how it was made.