Gas transmission pipeline · Abu Sennan to Alexandria
BED/AS–Ameryia Gas Pipeline
BED/AS–Ameryia Gas Pipeline is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 160 km long and 3.58 bcm/y of capacity. It runs from Abu Sennan to Alexandria. It is owned by General Petroleum Co.
Length
160 km
Capacity
3.58 bcm/y
2.6 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 610 mm (24 in)
Route
BED/AS–Ameryia Gas Pipeline runs from Abu Sennan to Alexandria. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Abu Sennan
- To
- Alexandria
- Start country
- Egypt
- End country
- Egypt
- Countries crossed
- Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Africa
- Route drawn on map
- 215 km
- GEM pipeline ID
- P3936
- Start year
- Not reported
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Operating | Abu Sennan → Alexandria | 160 | 3.58 | 610 mm | — | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does BED/AS–Ameryia Gas Pipeline run?
- BED/AS–Ameryia Gas Pipeline runs from Abu Sennan to Alexandria, crossing Egypt.
- How long is BED/AS–Ameryia Gas Pipeline?
- BED/AS–Ameryia Gas Pipeline is 160 km long.
- How much gas can BED/AS–Ameryia Gas Pipeline carry?
- BED/AS–Ameryia Gas Pipeline has a design capacity of 3.58 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is BED/AS–Ameryia Gas Pipeline operating?
- BED/AS–Ameryia Gas Pipeline is operating.
- Who owns BED/AS–Ameryia Gas Pipeline?
- BED/AS–Ameryia Gas Pipeline is owned by General Petroleum Co, as recorded in the current tracker release.