LNG Chain

Gas transmission pipeline · Murfeld to Cersak

Austria–Slovenia Interconnector (SOL) Gas Pipeline

Austria–Slovenia Interconnector (SOL) Gas Pipeline is a proposed gas transmission pipeline crossing Austria, Slovenia. The tracker lists 1 tracked segment, 28 km long, starting up in 2028. It runs from Murfeld to Cersak. It is owned by Plinovodi doo.

Length

28 km

Capacity

Not reported

Segments tracked

1

Largest diameter 800 mm (31 in)

Route

Austria–Slovenia Interconnector (SOL) Gas Pipeline runs from Murfeld to Cersak. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Murfeld
To
Cersak
Start country
Austria
End country
Slovenia
Countries crossed
Austria, Slovenia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
27 km
GEM pipeline ID
P3606
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Entry MurfeldProposedMurfeld → Cersak28Not reported800 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies