Gas transmission pipeline · Israel – Egypt
Ashdod–Ashkelon Gas Pipeline
Ashdod–Ashkelon Gas Pipeline is an operating gas transmission pipeline crossing Israel, Egypt. The tracker lists 1 tracked segment, 42 km long and 0.03 bcm/y of capacity, starting up in 2026. It is owned by Israel Natural Gas Lines Ltd.
Length
42 km
Capacity
0.03 bcm/y
0.0 Mtpa LNG equivalent
Segments tracked
1
Largest diameter 914 mm (36 in)
Route
Ashdod–Ashkelon Gas Pipeline runs from Israel – Egypt. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Ashdod
- To
- Not reported
- Start country
- Israel
- End country
- Israel
- Countries crossed
- Israel, Egypt
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Asia
- Route drawn on map
- 42 km
- GEM pipeline ID
- P3657
- Start year
- 2026
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Offshore Segment | Operating | Ashdod → ? | 42 | 0.03 | 914 mm | 2026 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
Parent companies
Common questions
Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.
- Where does Ashdod–Ashkelon Gas Pipeline run?
- Ashdod–Ashkelon Gas Pipeline is recorded in Israel and Egypt. Global Energy Monitor reports no start and end points for it.
- How long is Ashdod–Ashkelon Gas Pipeline?
- Ashdod–Ashkelon Gas Pipeline is 42 km long.
- How much gas can Ashdod–Ashkelon Gas Pipeline carry?
- Ashdod–Ashkelon Gas Pipeline has a design capacity of 0.03 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
- Is Ashdod–Ashkelon Gas Pipeline operating?
- Ashdod–Ashkelon Gas Pipeline is operating, having started in 2026.
- Who owns Ashdod–Ashkelon Gas Pipeline?
- Ashdod–Ashkelon Gas Pipeline is owned by Israel Natural Gas Lines Ltd, as recorded in the current tracker release.