LNG Chain

Gas transmission pipeline · Newlands to Gladstone

Arrow Bowen Pipeline

Arrow Bowen Pipeline is a cancelled gas transmission pipeline in Australia. The tracker lists 1 tracked segment, 580 km long and 15.05 bcm/y of capacity, starting up in 2028. It runs from Newlands to Gladstone. It is owned by Arrow Energy.

Length

580 km

Capacity

15.1 bcm/y

11.1 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Arrow Bowen Pipeline runs from Newlands to Gladstone. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Newlands
To
Gladstone
Start country
Australia
End country
Australia
Countries crossed
Australia
Onshore / offshore
Not reported
Fuel
Gas
Region
Oceania
Route drawn on map
467 km
GEM pipeline ID
P1131
Start year
2028
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineCancelledNewlands → Gladstone58015.11067 mm2028GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Fishermans Landing LNG TerminalAustraliaExportCancelled11.3 kmroute proximity
Queensland Curtis LNG TerminalAustraliaExportOperating15 kmroute proximity
Australia Pacific LNG TerminalAustraliaExportOperating15.2 kmroute proximity
Gladstone LNG TerminalAustraliaExportOperating15.7 kmroute proximity
Arrow Energy LNG TerminalAustraliaExportCancelled17.2 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies