Gas transmission pipeline · Oklahoma to Bennington
Arkoma Residue Capacity Pipeline
Arkoma Residue Capacity Pipeline is a cancelled gas transmission pipeline in United States. The tracker lists 1 tracked segment, 129 km long and 10.22 bcm/y of capacity, starting up in 2019. It runs from Oklahoma to Bennington. It is owned by Tall Oak Midstream.
Length
129 km
Capacity
10.2 bcm/y
7.5 Mtpa LNG equivalent
Segments tracked
1
Route
Arkoma Residue Capacity Pipeline runs from Oklahoma to Bennington. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Oklahoma
- To
- Bennington
- Start country
- United States
- End country
- United States
- Countries crossed
- United States
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Americas
- Route drawn on map
- 121 km
- GEM pipeline ID
- P0318
- Start year
- 2019
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Cancelled | Oklahoma → Bennington | 129 | 10.2 | — | 2019 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
No tracked LNG terminal lies within 25 km of this pipeline's route.
Owners and operators
Stakes as reported by GEM per segment, merged across segments.