LNG Chain

Gas transmission pipeline · Jaber to Homs

Arab Gas Pipeline

Arab Gas Pipeline is an operating gas transmission pipeline crossing Jordan, Syria. The tracker lists 1 tracked segment, 324 km long and 10.3 bcm/y of capacity, starting up in 2008. It runs from Jaber to Homs. It is owned by Syrian Petroleum Co.

Length

324 km

Capacity

10.3 bcm/y

7.6 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Arab Gas Pipeline runs from Jaber to Homs. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Jaber
To
Homs
Start country
Jordan
End country
Syria
Countries crossed
Jordan, Syria
Onshore / offshore
Not reported
Fuel
Gas
Region
Asia
Route drawn on map
264 km
GEM pipeline ID
P7540
Start year
2008
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Jaber-Homs Gas PipelineOperatingJaber → Homs32410.3914 mm2008GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.