LNG Chain

Gas transmission pipeline · Midline County to Jefferson County

Apex Pipeline

Apex Pipeline is a proposed gas transmission pipeline in United States. The tracker lists 1 tracked segment, 906 km long and 20.44 bcm/y of capacity. It runs from Midline County to Jefferson County. It is owned by Terga Resources.

Length

906 km

Capacity

20.4 bcm/y

15.0 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 1067 mm (42 in)

Route

Apex Pipeline runs from Midline County to Jefferson County. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Midline County
To
Jefferson County
Start country
United States
End country
United States
Countries crossed
United States
Onshore / offshore
Not reported
Fuel
Gas
Region
Americas
Route drawn on map
890 km
GEM pipeline ID
P5931
Start year
Not reported
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineProposedMidline County → Jefferson County90620.41067 mmGEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

TerminalCountryImport / exportStatusDistanceMatched by
Golden Pass LNG TerminalUnited StatesExportOperating0.1 kmroute proximity
Port Arthur LNG TerminalUnited StatesExportUnder construction1 kmroute proximity
Sabine Pass LNG TerminalUnited StatesExportOperating3.6 kmroute proximity
Alturas LNG TerminalUnited StatesExportCancelled7.7 kmroute proximity
Phillips 66 Beamont Oil TerminalUnited StatesExportOperating16.5 kmroute proximity
Beacon Port LNG TerminalUnited StatesImportCancelled20.5 kmroute proximity

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies