LNG Chain

Gas transmission pipeline · Aleksandrovac to Tutin

Aleksandrovac-Novi Pazar-Tutin Pipeline

Aleksandrovac-Novi Pazar-Tutin Pipeline is an under construction gas transmission pipeline in Serbia. The tracker lists 1 tracked segment, 117 km long and 0.66 bcm/y of capacity, starting up in 2023. It runs from Aleksandrovac to Tutin. It is owned by Srbijagas.

Length

117 km

Capacity

0.66 bcm/y

0.5 Mtpa LNG equivalent

Segments tracked

1

Largest diameter 300 mm (12 in)

Route

Aleksandrovac-Novi Pazar-Tutin Pipeline runs from Aleksandrovac to Tutin. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Aleksandrovac
To
Tutin
Start country
Serbia
End country
Serbia
Countries crossed
Serbia
Onshore / offshore
Not reported
Fuel
Gas
Region
Europe
Route drawn on map
78 km
GEM pipeline ID
P2464
Start year
2023
GEM wiki page
gem.wiki

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Whole pipelineUnder constructionAleksandrovac → Tutin1170.66300 mm2023GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Owners

Parent companies

Common questions

Generated from the same tracker fields as the tables above, so the two cannot disagree. Each answer stands on its own.

Where does Aleksandrovac-Novi Pazar-Tutin Pipeline run?
Aleksandrovac-Novi Pazar-Tutin Pipeline runs from Aleksandrovac to Tutin, crossing Serbia.
How long is Aleksandrovac-Novi Pazar-Tutin Pipeline?
Aleksandrovac-Novi Pazar-Tutin Pipeline is 117 km long.
How much gas can Aleksandrovac-Novi Pazar-Tutin Pipeline carry?
Aleksandrovac-Novi Pazar-Tutin Pipeline has a design capacity of 0.66 bcm/y. Where every segment of a project repeats the same figure it is counted once rather than summed.
Is Aleksandrovac-Novi Pazar-Tutin Pipeline operating?
Aleksandrovac-Novi Pazar-Tutin Pipeline is under construction, with a reported start year of 2023.
Who owns Aleksandrovac-Novi Pazar-Tutin Pipeline?
Aleksandrovac-Novi Pazar-Tutin Pipeline is owned by Srbijagas, as recorded in the current tracker release.