Gas transmission pipeline · Adjovscina to Lucija
Ajdovščina – Lucija Gas Pipeline
Ajdovščina – Lucija Gas Pipeline is an under construction gas transmission pipeline in Slovenia. The tracker lists 1 tracked segment, 46 km long, starting up in 2025. It runs from Adjovscina to Lucija. It is owned by Plinovodi doo.
Length
46 km
Capacity
Not reported
Segments tracked
1
Largest diameter 400 mm (16 in)
Route
Ajdovščina – Lucija Gas Pipeline runs from Adjovscina to Lucija. The map draws the tracked route and any LNG terminal within 25 km of it.
Loads about 250 kB of map code and the country outline file.
- From
- Adjovscina
- To
- Lucija
- Start country
- Slovenia
- End country
- Slovenia
- Countries crossed
- Slovenia
- Onshore / offshore
- Not reported
- Fuel
- Gas
- Region
- Europe
- Route drawn on map
- 47 km
- GEM pipeline ID
- P4327
- Start year
- 2025
- GEM wiki page
- gem.wiki
Segments
Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.
| Segment | Status | From → to | Length | Capacity | Diameter | Start | Route from |
|---|---|---|---|---|---|---|---|
| Whole pipeline | Under construction | Adjovscina → Lucija | 46 | Not reported | 400 mm | 2025 | GEM's route file |
Connected LNG terminals
Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.
| Terminal | Country | Import / export | Status | Distance | Matched by |
|---|---|---|---|---|---|
| Zaule LNG Terminal | Italy | Import | Cancelled | 5.7 km | route proximity |
Owners and operators
Stakes as reported by GEM per segment, merged across segments.
Owners
- Plinovodi doo100%
Parent companies
- Plinhold doo100%