LNG Chain

Gas transmission pipeline · Bair El Abd to North Sinai

Abr Sinai Gas Pipeline I

Abr Sinai Gas Pipeline I is an operating gas transmission pipeline in Egypt. The tracker lists 1 tracked segment, 75 km long, starting up in 2019. It runs from Bair El Abd to North Sinai.

Length

75 km

Capacity

Not reported

Segments tracked

1

Largest diameter 914 mm (36 in)

Route

Abr Sinai Gas Pipeline I runs from Bair El Abd to North Sinai. The map draws the tracked route and any LNG terminal within 25 km of it.

Loads about 250 kB of map code and the country outline file.

From
Bair El Abd
To
North Sinai
Start country
Egypt
End country
Egypt
Countries crossed
Egypt
Onshore / offshore
Not reported
Fuel
Gas
Region
Africa
Route drawn on map
77 km
GEM pipeline ID
P8044
Start year
2019
GEM wiki page
Not reported

Segments

Each row is one row of GEM's pipeline file. Project-level figures repeated on every segment are counted once in the totals above.

SegmentStatusFrom → toLengthCapacityDiameterStartRoute from
Bair El Abd-Arish PipelineOperatingBair El Abd → North Sinai75Not reported914 mm2019GEM's route file

Connected LNG terminals

Terminals whose coordinates fall within 25 km of this route, or whose name matches the pipeline. Proximity is not proof of a physical connection.

No tracked LNG terminal lies within 25 km of this pipeline's route.

Owners and operators

Stakes as reported by GEM per segment, merged across segments.

Ownership is not reported for this pipeline.