Country
Lebanon: LNG infrastructure
Lebanon has 4 LNG terminals and 2 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
operating regasification
Pipelines
2
5,701 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 4 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Lebanon
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Beddawi FSRU | Import | FSRU | Cancelled | Not reported | 1 | — |
| Deir Ammar FSRUNorth Lebanon | Import | FSRU | Proposed | Not reported | 1 | — |
| Selaata FSRU | Import | FSRU | Cancelled | Not reported | 1 | — |
| Zahrani FSRU | Import | FSRU | Cancelled | Not reported | 1 | — |
Gas pipelines crossing Lebanon
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Arab Gas PipelineHoms → Deir Ammar | Syria, Lebanon | Mothballed | 101 km | 10.3 bcm/y | 1 | 2009 |
| Iran–Iraq–Syria Gas PipelineAsaluyeh → Damascus | Iran, Iraq, Syria, Lebanon | Cancelled | 5,600 km | 40.1 bcm/y | 1 | — |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.