Country
Gabon: LNG infrastructure
Gabon has 2 LNG terminals in the Global Energy Monitor tracker. Nothing is operating yet, but 0.7 Mtpa is under construction, all of it liquefaction for export.
Export capacity
—
0.7 Mtpa under construction
Import capacity
—
no import terminal tracked
Pipelines
0
crossing this country
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 2 | — | 0.7 |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
LNG terminals in Gabon
| Import / export | Type | Units | ||||
|---|---|---|---|---|---|---|
| Boudji FLNG Terminal | Export | FLNG | Cancelled | Not reported | 1 | — |
| Cap Lopez FLNG Terminal | Export | FLNG | Under construction | 0.7 Mtpaunder construction | 1 | — |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.