Bosnia And Herzegovina: LNG infrastructure
Bosnia And Herzegovina has 4 tracked gas pipelines in the Global Energy Monitor tracker. It operates no LNG terminal capacity, and none is under construction.
Export capacity
—
no export terminal tracked
Import capacity
—
no import terminal tracked
Pipelines
4
600 km tracked
Fleet
0
0 flagged, 0 owned from here
Import and export balance
| Direction | Terminals | Operating | Under construction |
|---|---|---|---|
| Export (liquefaction) | 0 | — | — |
| Import (regasification) | 0 | — | — |
Figures are whole-terminal capacities in Mtpa, not adjusted for ownership stakes or utilisation.
Gas pipelines crossing Bosnia And Herzegovina
Any pipeline whose country list includes this country, including transit pipelines that only pass through.
| Countries | Segments | |||||
|---|---|---|---|---|---|---|
| Bosnia and Herzegovina–Croatia South Interconnection Gas PipelinePosusje → Novi Travnik | Bosnia And Herzegovina, Croatia | Proposed | 168 km | 1.5 bcm/y | 1 | 2026 |
| Bosnia and Herzegovina–Croatia South Interconnection Gas PipelineZagvozd → Posusje | Bosnia And Herzegovina, Croatia | Proposed | 22 km | 1.5 bcm/y | 1 | 2026 |
| Serbia–Bosnia Interconnector Gas PipelineIndjija → Bijeljina | Serbia, Bosnia And Herzegovina | Proposed | 102 km | 1.2 bcm/y | 1 | 2026 |
| Serbia–Bosnia Interconnector Gas PipelineBijeljina → Novi Grad | Bosnia And Herzegovina | Proposed | 308 km | 1.2 bcm/y | 1 | 2026 |
Chokepoint exposure
Chokepoint exposure is shown on each terminal page, taken from a hand-maintained trade-lane table. It is an editorial routing model of typical laden voyages, not vessel tracking. The exposure feed aggregates it by chokepoint.